Date of Award
2015
Document Type
Thesis
Degree Name
Bachelor of Science (BS)
Department
Geology
First Advisor
Dr. Ronald Matheney
Abstract
Electrical Conductivity (EC) analyses of soil samples collected at a coproduced brine spill site near Mandaree, McKenzie County, North Dakota suggest that the site has been remediated. Five soil samples were taken from the area 12 inches below the ground surface. In the lab the saturation extract (Rhoades, 1982) method was used to collect a solution from the soil sample. From the solution we measured the EC. EC values showed a slightly higher reading from the samples within the spill site compared to sample that was taken outside of the spill where no contaminated was found. Chemical analyses of the water samples also indicate that the levels of sodium (Na) were slightly higher within the spill site. Although these measurements were higher within the spill site they’re not high enough to present a salinity hazard.
Recommended Citation
Jeannotte, Tyson Lee, "Brine Spill Remediation: Crestwood Pipeline, McKenzie County, North Dakota" (2015). Undergraduate Theses and Senior Projects. 115.
https://commons.und.edu/senior-projects/115