Files
Download Full Text (1.5 MB)
Description
This document includes a letter dated April 29, 1955 from A. J. Shriner to United States (US) Representative Usher Burdick and an attached resolution adopted by the City of Bismarck North Dakota's Chamber of Commerce regarding the operating pool level of Garrison Dam. The resolution states that the Bismarck Chamber of Commerce met and approved this resolution in support an operating pool level of 1,850 feet on March 9, 1955. The language in this resolution closely resembles the language used in several resolutions regarding Garrison Dam's pool level sent to Burdick in 1955. These other resolutions can also be found in this collection.
Date of Work
4-29-1955
Keywords
Garrison Dam, Garrison Reservoir, Garrison Diversion, pool level, pool height, water height, water level, flood height, flood level, US Flood Act of 1944, United States Army Corps of Engineers, US Army Engineers, US Bureau of Reclamation, North Dakota State Water Commission, Missouri Basin Inter-Agency Committee, US Federal Power Commission, City of Bismarck North Dakota, Bismarck Chamber of Commerce
Organizations Referenced
City of Bismarck North Dakota, Bismarck Chamber of Commerce, United States Army Corps of Engineers, US Army Engineers, US Bureau of Reclamation, North Dakota State Water Commission, Missouri Basin Inter-Agency Committee, US Federal Power Commission
People Referenced
Norman Brunsdale, William Langer, Milton Young, Otto Krueger, Usher Burdick, Fred G. Aandahl, A. J. Shriner
Recommended Citation
City of Bismarck Chamber of Commerce and Shriner, AJ, "Resolution by Bismarck Chamber of Commerce sent by A. J. Shriner to Representative Burdick Regarding Garrison Dam Pool Level, April 29, 1955" (1955). Usher Burdick Papers. 328.
https://commons.und.edu/burdick-papers/328